Friday, November 28, 2008

Build-Out Phase DONE!

After months of sweat and toil the studio is finally finished! There are a few small things left, hanging the big green curtain, a couple lights and bookshelves, but the studio is ready for recording and mixing. I purchased about 2500 books, which will be featured on several walls and will thus be changing the name of thes studio to "the Library." Pretty excited about the name change. Here are some photos of my new workspace(s)...

Main tracking room
Control Room
This is the large isolation room. (both of my iso's are far too large to call them "booths")
I inherited a turn of the century baby grand piano from a guy across the hall!
Small isolation room
The beautiful view from my control room.
As you can imagine, I am really excited about the new space and look forward to capturing hours upon hours of good music here.

Monday, November 17, 2008

Build-Out Phase Six

All the trim and baseboards have been installed. The rooms have been painted and now I am waiting on the final inspection so I can finally get all my stuff moved in and set up.